Manufacturing

Manufacturing Process

How a finished cable is made — step by step.

Visual dossier/ 05

Conductor bobbins ready for processing
01 / 05Conductor bobbins ready for processing
Conductor drawing in progress
02Conductor drawing in progress
Conductor stranding line
03Conductor stranding line
Ageing test chamber
04Ageing test chamber
On-site cable sample inspection
05On-site cable sample inspection
03.

Conductor preparation

Copper or aluminium rod is drawn and annealed, then stranded into the required conductor class and cross-section (solid, stranded, or flexible Class 5).

03.

Insulation & sheathing

Conductors are insulated by extrusion — PVC, cross-linked polyethylene (XLPE) or rubber — and multi-core constructions are cabled, filled and sheathed. Optional steel-tape or steel-wire armour is applied where required.

03.

Marking & testing

Cables are printed and then subjected to routine electrical and dimensional tests before being checked, measured and prepared for dispatch.